WCMRC

Beecher Bay Response Base

WCMRC – Beecher Bay Response Base

(Concrete Subcontractor)

Scansa Construction was contracted by Durwest Construction Management for the concrete scope of the newly built Western Canadian Marine Response Center in Beecher Bay. Scansa’s work consisted of forming, placing, and finishing of cast-in-place foundation and slab-on-grade for the base building as well as the exterior retaining walls. The building foundation supports an 867m2 prefabricated metal

building by FARO that required precise embedment of building anchors for connection to the foundation. Also, the building featured a mezzanine with another 407m2 of floor area where Scansa also provided the concrete toppings.

Completed November 2023

Unit 203, 2089 MILLSTREAM RD, LANGFORD, BC V9B 6H4

Phone: (250) 478.5222 

Fax: (250) 478.5204

Email: info@scansa.ca

NAVIGATION

FOLLOW US

DIRECTIONS

© Copyright - Scansa Construction Ltd. - All Rights Reserved

Your cart is empty Continue
Shopping Cart
Subtotal:
Discount 
Discount 
View Details
- +
Sold Out